Case Study: Meadowcrest Energy Upgrade
Case Study Energy Upgrades
Air Seal
During construction, Go Green used smart building techniques to maximize the home’s energy efficiency: meticulous air sealing of the building envelope; duct mastic used at all electrical boxes; fire proof caulking on all seams of recessed light housing.
HVAC
Replacing the HVAC system using a Manual J, D, & S, guarantees its proper fit and function.
Insulation
Calculation of the specifics of the wall system to address any dew points that could cause problems with moisture in the wall; assuring the quality of the installation of ceiling and wall insulation; adding insulation in the HVAC ducts to prevent leakage and temperature change, and promoting efficient air flow to the rooms.