Case Study: Meadowcrest Energy Upgrade

Case Study Energy Upgrades

Air Seal
During construction, Go Green used smart building techniques to maximize the home’s energy efficiency: meticulous air sealing of the building envelope; duct mastic used at all electrical boxes; fire proof caulking on all seams of recessed light housing.



HVAC
Replacing the HVAC system using a Manual J, D, & S, guarantees its proper fit and function.


Insulation

Calculation of the specifics of the wall system to address any dew points that could cause problems with moisture in the wall; assuring the quality of the installation of ceiling and wall insulation; adding insulation in the HVAC ducts to prevent leakage and temperature change, and promoting efficient air flow to the rooms.
 

To play, press and hold the enter key. To stop, release the enter key.